Aggregated audit tracker
Every logged issue, with the number of days it has remained outstanding since the date it was first noticed.
You are viewing the public register. Reporter lot numbers and photographs are visible to registered residents only.
- Matching issues
- 18
- Still outstanding
- 15
- Resolved
- 3
- Cumulative days outstanding
- 1029
Sum of days open across all unresolved items
Age colour coding— safety hazards and urgent repairs escalate after 7 / 14 / 30 days; other categories after 30 / 60 / 90 days.
- Within expected timeframe
- Ageing
- Overdue
- Significantly overdue
- Resolved
- GS-0004Pending Strata ActionOpen 169 days — Significantly overdue
Exterior
StructuralHorizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed.
- First noticed
- 10 Feb 2026
- Reported by
- —
- GS-0010Pending Strata ActionOpen 169 days — Significantly overdue
Exterior
StructuralHorizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed.
- First noticed
- 10 Feb 2026
- Reported by
- —
- GS-0016Pending Strata ActionOpen 169 days — Significantly overdue
Exterior
StructuralHorizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed.
- First noticed
- 10 Feb 2026
- Reported by
- —
- GS-0001Pending Strata ActionOpen 97 days — Significantly overdue
Carpark
Safety HazardFluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk.
- First noticed
- 23 Apr 2026
- Reported by
- —
- GS-0007Pending Strata ActionOpen 97 days — Significantly overdue
Carpark
Safety HazardFluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk.
- First noticed
- 23 Apr 2026
- Reported by
- —
- GS-0013Pending Strata ActionOpen 97 days — Significantly overdue
Carpark
Safety HazardFluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk.
- First noticed
- 23 Apr 2026
- Reported by
- —
- GS-0002Pending Strata ActionOpen 42 days — Significantly overdue
Plumbing
Urgent RepairContinuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week.
- First noticed
- 17 June 2026
- Reported by
- —
- GS-0008Pending Strata ActionOpen 42 days — Significantly overdue
Plumbing
Urgent RepairContinuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week.
- First noticed
- 17 June 2026
- Reported by
- —
- GS-0014Pending Strata ActionOpen 42 days — Significantly overdue
Plumbing
Urgent RepairContinuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week.
- First noticed
- 17 June 2026
- Reported by
- —
- GS-0003LoggedOpen 23 days — Within expected timeframe
Foyer
General MaintenanceEntry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured.
- First noticed
- 6 July 2026
- Reported by
- —
- GS-0009LoggedOpen 23 days — Within expected timeframe
Foyer
General MaintenanceEntry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured.
- First noticed
- 6 July 2026
- Reported by
- —
- GS-0015LoggedOpen 23 days — Within expected timeframe
Foyer
General MaintenanceEntry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured.
- First noticed
- 6 July 2026
- Reported by
- —
- GS-0005LoggedOpen 12 days — Ageing
Stairwells
Safety HazardHandrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied.
- First noticed
- 17 July 2026
- Reported by
- —
- GS-0011LoggedOpen 12 days — Ageing
Stairwells
Safety HazardHandrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied.
- First noticed
- 17 July 2026
- Reported by
- —
- GS-0017LoggedOpen 12 days — Ageing
Stairwells
Safety HazardHandrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied.
- First noticed
- 17 July 2026
- Reported by
- —
- GS-0006ResolvedResolved after 14 days
Lifts
Urgent RepairLift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced.
- First noticed
- 31 May 2026
- Reported by
- —
- GS-0012ResolvedResolved after 14 days
Lifts
Urgent RepairLift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced.
- First noticed
- 31 May 2026
- Reported by
- —
- GS-0018ResolvedResolved after 14 days
Lifts
Urgent RepairLift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced.
- First noticed
- 31 May 2026
- Reported by
- —
| Ref | Area | Category | Description | First noticed | Status | Days open |
|---|---|---|---|---|---|---|
| GS-0004 | Exterior | Structural | Horizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed. | 10 Feb 2026 | Pending Strata Action | Open 169 days — Significantly overdueSignificantly overdue |
| GS-0010 | Exterior | Structural | Horizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed. | 10 Feb 2026 | Pending Strata Action | Open 169 days — Significantly overdueSignificantly overdue |
| GS-0016 | Exterior | Structural | Horizontal crack approximately 900mm long in the render on the eastern external wall, level 2, beneath the balcony slab edge. Crack width has visibly increased since first noticed. | 10 Feb 2026 | Pending Strata Action | Open 169 days — Significantly overdueSignificantly overdue |
| GS-0001 | Carpark | Safety Hazard | Fluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk. | 23 Apr 2026 | Pending Strata Action | Open 97 days — Significantly overdueSignificantly overdue |
| GS-0007 | Carpark | Safety Hazard | Fluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk. | 23 Apr 2026 | Pending Strata Action | Open 97 days — Significantly overdueSignificantly overdue |
| GS-0013 | Carpark | Safety Hazard | Fluorescent light fitting in the basement carpark, bay row B (adjacent to the lift lobby door), is not operating. The area between bays B4 and B9 is unlit after dusk. | 23 Apr 2026 | Pending Strata Action | Open 97 days — Significantly overdueSignificantly overdue |
| GS-0002 | Plumbing | Urgent Repair | Continuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week. | 17 June 2026 | Pending Strata Action | Open 42 days — Significantly overdueSignificantly overdue |
| GS-0008 | Plumbing | Urgent Repair | Continuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week. | 17 June 2026 | Pending Strata Action | Open 42 days — Significantly overdueSignificantly overdue |
| GS-0014 | Plumbing | Urgent Repair | Continuous water ingress on the basement ceiling below the level 1 common bathroom riser. Approximately 300mm x 400mm of damp staining, increasing in size week on week. | 17 June 2026 | Pending Strata Action | Open 42 days — Significantly overdueSignificantly overdue |
| GS-0003 | Foyer | General Maintenance | Entry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured. | 6 July 2026 | Logged | Open 23 days — Within expected timeframeWithin expected timeframe |
| GS-0009 | Foyer | General Maintenance | Entry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured. | 6 July 2026 | Logged | Open 23 days — Within expected timeframeWithin expected timeframe |
| GS-0015 | Foyer | General Maintenance | Entry door closer on the Gray Street foyer door does not latch fully. The door rests approximately 15mm open unless pulled closed by hand, leaving the building unsecured. | 6 July 2026 | Logged | Open 23 days — Within expected timeframeWithin expected timeframe |
| GS-0005 | Stairwells | Safety Hazard | Handrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied. | 17 July 2026 | Logged | Open 12 days — AgeingAgeing |
| GS-0011 | Stairwells | Safety Hazard | Handrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied. | 17 July 2026 | Logged | Open 12 days — AgeingAgeing |
| GS-0017 | Stairwells | Safety Hazard | Handrail on the western fire stair between levels 1 and 2 is loose at two fixing points. Rail moves approximately 20mm when weight is applied. | 17 July 2026 | Logged | Open 12 days — AgeingAgeing |
| GS-0006 | Lifts | Urgent Repair | Lift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced. | 31 May 2026 | Resolved | Resolved after 14 daysResolved |
| GS-0012 | Lifts | Urgent Repair | Lift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced. | 31 May 2026 | Resolved | Resolved after 14 daysResolved |
| GS-0018 | Lifts | Urgent Repair | Lift car doors reopened repeatedly at ground level without an obstruction present. Service call attended and door sensor replaced. | 31 May 2026 | Resolved | Resolved after 14 daysResolved |